PL

Infrastructure

RSS

Closing Via Baltica

schedule 07 April 2017
Tomasz Cudowski
editor-in-chief

POLAND The tendering process for the construction of the Łomża bypass is now underway. Two sections of the S61 with a combined length of over 20 km are to be built, to allow transit traffic the north and the west to avoid the town centre.

Infrastructure

Two new sections of S17

schedule 17 March 2017

POLAND The Masovian provincial government has issued permits for the construction of two sections of the S17 expressway: between Garwolin and the Gończyce ring road, and between Gończyce to the boundary of Lublin province.

Transport hub for Zielona Góra

schedule 15 March 2017
Eurobuild CEE

POLAND Skanska has been chosen to be the general contractor for a transport hub development in Zielona Góra.

Infrastructure

Chance for Kraków metro subsidy

schedule 06 March 2017
Eurobuild CEE

POLAND A chance has arisen for a subsidy to be granted to Kraków for a feasibility study for the construction of a fast, collision-free system of municipal rail transport.

Infrastructure

Inowrocław bypass to be more expensive

schedule 30 January 2017
Anna Pakulniewicz

POLAND The General Directorate of National Roads and Motorways (GDDKiA) has revealed that the lowest bid for the construction of a section of the Inowrocław bypass connecting national roads 15 and 25 was has been submitted by a consortium of PBDiM Kobylarnia and Mirbud.

Cities to invest over PLN 2 bln in roads

schedule 26 January 2017
Eurobuild CEE

POLAND Sixteen Polish cities are to carry out key road projects using PLN 2.15 bln in subsidies from the EU Infrastructure and Environment 2014–2020 programme..

Quicker road to Gdańsk

schedule 10 January 2017
Tomasz Szpyt-Grzegórski

POLAND A 9.2 km section of S7 expressway between Miłomłyn and Ostróda North has been opened.

Infrastructure

Łódź Fabryczna opens

schedule 31 December 2016
Eurobuild CEE

POLAND The Łódź Fabryczna railway station was opened on December 10th.

Kościerzyna ring road half-done

schedule 21 December 2016
Eurobuild CEE

POLAND The Kościerzyna ring road along national road no. 20 between Stargard Szczeciński and Gdynia is now half-finished.

Infrastructure

Lublin western ring road opens

schedule 19 December 2016
Tomasz Cudowski
editor-in-chief

POLAND The Lublin ring road along the S19 expressway has now been opened. The road, which was built by Budimex, bypasses Lublin from the west. Budimex has built a 9.8 km section under the contract.

Infrastructure

PLN 8 bln for transport projects

schedule 09 December 2016
Tomasz Cudowski
editor-in-chief

POLAND The European Commission has granted subsidies for 16 Polish transport projects worth almost EUR 1.9 bln (over PLN 8 bln).

Infrastructure

A1 motorway nearer completion

schedule 04 November 2016
Adam Zdrodowski

POLAND The Polish infrastructure and construction ministry has taken the decision to build the final stretch of the A1 motorway.

New road contract for Nordecon

schedule 27 October 2016
Adam Zdrodowski

ESTONIA General contractor Nordecon and the Estonian Road Administration have signed a EUR 11.2 mln net agreement to upgrade the 9 km Ääsmäe-Kohatu section of the Tallinn-Pärnu-Ikla road.

New terminal for Timișoara airport

schedule 14 October 2016
Alex Hayes
journalist

ROMANIA The feasibility study for a new 30,000 sqm terminal at Traian Vuia Airport in Timișoara has been completed, report local media.

Infrastructure

EU funds for Warsaw metro

schedule 23 September 2016
Adam Zdrodowski

POLAND Warsaw’s second metro line has obtained PLN 1.83 bln in EU financing for the PLN 3.16 bln infrastructure development.

Strabag on the right track in Hungary

schedule 20 September 2016
Adam Zdrodowski

HUNGARY The railway line between Budapest and Esztergom will be electrified and upgraded.

Infrastructure

Romania plans to upgrade transport links

schedule 15 September 2016
Alex Hayes
journalist

ROMANIA The government has approved a transport master plan for the country that will allow it to draw on EU structural funds.

Infrastructure

Old City Harbour ready in May 2017

schedule 29 August 2016
Anna Pakulniewicz

ESTONIA Nordecon has been contracted by the Port of Tallinn [Tallina Sadam] for the construction of Logi Street and the northwest section of Tallinn’s Old City Harbour.

GTC sorting out Tarchomin traffic

schedule 22 August 2016
Anna Pakulniewicz

POLAND GTC, the developer of Galeria Północna in Białołęka, is starting the redevelopment of the existing traffic layout around the newly-built shopping centre.

Infrastructure

A4 is now complete

schedule 09 August 2016
Ewa Andrzejewska

POLAND The final stretch of the A4 motorway from Rzeszów to Jarosław, which was constructed by a consortium of Budimex and Strabag, is now complete. The official opening of the Rzeszów East – Jarosław section of the A4 motorway took place on July 20th. The A4 motorway is part of the route stretching from Western Europe to Ukraine.

Edition 4 (287) April 2024

Categories