Crop of tenders from GDDKiA
ConstructionThese include the latest sections of the S6, S7, S17 and S19 roads in the Masovian, Subcarpathian, Małopolski, Pomeranian and Lower Silesian provinces. To the S7 expressway will be added the following sections: Warsaw–Grójec between Warsaw Airport and the Lesznowola interchange (6.6 km), from the Lesznowola interchange to the Tarczyn Północ interchange (14.8 km), between the Tarczyn Północ interchange and the Grójec ring road (7.9 km), from the boundary of the Świętokrzyskie and Małopolska provinces to the Szczepanowice interchange (23.3 km), between the Szczepanowice interchange and the Widoma interchange (14 km), and between the Widoma interchange and Kraków (18.3 km). The S19 expressway will be extended with a section between the Lublin and Subcarpathian provinces boundary and Sokołów Małopolski, including from the Lasy Janowskie interchange to the Nisko Południe interchange (24.3 km) and between the Nisko Południe interchange and the Sokołów Małopolski Północ interchange (29.9 km).
The Metropolitan TriCity Ring Road along the S6 expressway will include the sections from the Chwaszczyno interchange to the Żukowo interchange (15.6 km) and between the Żukowo interchange and the Gdańsk Południe interchange (15.1 km) including over 6 km of ring road at Żukowo.
In addition, a 2.5 km stretch of the S17 expressway is to be built from from the Zakręt interchange to the Lubelska interchange in the Masovian province as well as a 7.8 km fast traffic trunk road as part of the Bolkowo ring road in Lower Silesia along national roads no. 3 and 5.
S7 sections in the Masovia and Wielkopolska provinces are also to be built for the expressway connection between Warsaw and the south of Poland via Radom and Kielce.
The S19 expressway from the Subcarpathian Province will join sections of the S19 commissioned by the Lublin branch of the General Directorate of National Roads and Motorways (GDDKiA). According to the governmental national road construction programme 2014–2023, the S19 expressway between Rzeszów and Lublin will have a length of 157.5 km. With the new interchanges, the Metropolitan TriCity Ring Road will provide access to areas located along national roads no. 7 and no. 20 and will ease congestion in the town centres of Żukowo and Chwaszczyno as well as partly relieve the current TriCity ring road along the existing S6 expressway.
An open door to redefining the commercial real estate market in Poland
An open door to redefining the commercial real estate market in Poland
Walter Herz
The investment slowdown in the commercial real estate sector that we have been observing in Poland for over a year is primarily the result of the tightening of monetary policy arou ...
The retail sector is not slowing down
The retail sector is not slowing down
Walter Herz
The pandemic, conflict in Ukraine as well as inflation and high interest rates that recent years have brought have reshaped the real estate market around the world. The global slow ...
Retail parks – current opportunities
Retail parks – current opportunities
Avison Young
Over the last few years, retail parks in Poland were mostly developed in smaller formats, around 5,000 sqm, either adding to the existing retail landscape or introducing modern ret ...