edition:
polskienglish
log in | register
previous
Competition for Copernican laboratory
next
Saller opens park in Sulechów

reklama

Fabryka Wody takes shape

Eurobuild CEE 26 May 2017
POLAND The city of Szczecin has chosen a concept by DreamWorlds for the Fabryka Wody aqua-park.

Work on a detailed architectural design will now begin. The new park will include a swimming pool building with recreational and sports pools as well as paddling pools for children, a water playground and slides. A VIP relaxation area is also planned as well as a leisure area including an infinity pool with a waterfall. The centre will also include a wellness and entertainment areas. The sauna section planned will be one of the largest in Poland. Cafés and restaurants are also planned. A complex of outdoor swimming pools is to be developed outside the facility, including a large recreational pool and leisure terraces. The investment cost is estimated at PLN 123 mln gross. Construction work will take until the end of 2017. On the granting of a building permit and the completion of the design, the construction work is to be put out to tender (probably in H2 2018).


Newsletter
Want to know more? Sign up for the Newsletter


reklama
reklama

conferences

reklama

reklama
About Us Contact Privacy Rules Archive Newsletter
Copyright 2017 EuroCEE. All rights reserved.