edition:
polskienglish
log in | register
previous
Acrobats and detectives in Galeria Malta
next
Nordic House shops in Praga district

reklama

Via Carpatia closer to Podkarpackie Region

Eurobuild CEE 29 August 2017
POLAND The General Directorate of National Roads and Motorways has chosen the most advantageous offers concerning the design and construction of S19 expressway from the end of the ring road of Kraśnik to the limits of the Podkarpackie Province, which will have a total length of nearly 33 km.

The most advantageous offer concerning its first section from Kraśnik Południe interchange to Janów Lubelski Pólnoc interchange (with a length of app. 18 km) was submitted by a consortium of Strabag and Strabag Infrastruktura Południe (worth nearly PLN 390 mln). The most advantageous offer concerning the second section constituting the ring road of Janów Lubelski (app. 7 km) was submitted by Mota-Engil Central Europe (app. PLN 148.5 mln). And for the third section, from Janów Lubelski Południe interchange to Lasy Janowskie interchange (app. PLN 8 mln) – by the consortium of Strabag and Strabag Infrastruktura Południe (app. PLN 183.6 mln). All the sections are to be executed within 34 months (excluding winter periods from the 15th of December until the 15th of March) and they will be covered by a guarantee for 10 years. Unless appeals are made within 10 days, the General Directorate of National Roads and Motorways will be able to sign agreements with the selected contractors regarding the design and construction of the three sections after the completion of a previous inspection carried out by the Public Procurement Office.


Newsletter
Want to know more? Sign up for the Newsletter


reklama
reklama

conferences

The 23rd Annual Property Market Convention in Poland
Eurobuild Awards 2017
reklama

reklama
About Us Contact Privacy Rules Archive Newsletter
Copyright 2017 EuroCEE. All rights reserved.