edition:
polskienglish
log in | register
previous
Napollo buys Piotr i Paweł centre in Poznań
next
Green light for Green Mokotów

reklama

Another S19 section completed

Eurobuild CEE 27 December 2017
POLAND Eurovia Polska and Warbud have completed zn over 6-km section of S19 expressway, which connects two international routes: E40 and E371 and moves transit transport out of the centre of Rzeszów. The contract price was over PLN 342 mln.
The project, which includes a section from Świlcza interchange to Rzeszów South (Kielanówka) interchange, is a continuation of expressway/motorway ring road of Rzeszów. “From today transit in the longitudinal direction will be able to smoothly omit Rzeszów from the west. The new route will make it possible to move ‘heavy traffic’ from urban areas. Importantly, it will considerably improve safety of pedestrians, particularly in the built-up area. Consequently, the entire Rzeszów conurbation will clearly sense greater comfort of everyday life thanks to a reduction of traffic, mostly transit traffic,” said Jacek Gryga, acting General Director of National Roads and Motorways. The enterprise involved: the design and acquisition of decisions and permits required by law, the construction and acquisition of an occupancy permit. The project was co-financed from European Union funds as part of the Infrastructure and Environment Operational Programme 2014-2020.

Newsletter
Want to know more? Sign up for the Newsletter


reklama
reklama

conferences

The 3rd Real Estate Table Tennis Tournament
The 9th Conference Office Market for Poland
The 24th Annual Property Market Convention
Eurobuild Awards 2018
reklama

reklama
About Us Contact Privacy Rules Archive Newsletter
Copyright 2017 EuroCEE. All rights reserved.