edition:
polskienglish
log in | register
previous
Kids to tweet from operating table
next
Everyone moves up at C&W

reklama

Tétris knocks down walls for Allianz

Anna Pakulniewicz 20 April 2018

Anna Pakulniewicz

Journalist

+48 22 356 25 07
anna@eurobuildcee.com

Ania covers the Baltic states’ real estate markets, architecture and urban planning in Warsaw as well as interior design. She is also the co-founder of Eurobuild TV. Among others, she has been employed by TVN CNBC, PAP Insider, WBJ (The Observer), Poland Monthly and IMM. She graduated from the Warsaw School of Economics, majoring in international relations. She has also completed postgraduate studies in macroeconomic analysis. In addition to this, she studied Lithuanian philology

Tétris knocks down walls for Allianz
The entire refurbishment was completed without closing the office
POLAND Tétris has refurbished the headquarters of Allianz to a design by Studio Quadra in the Topaz office building at ul. Rodziny Hiszpańskich 1 in Warsaw.

The offices cover an area of around 14,000 sqm over seven floors and the project also covered the renovation of the lift foyers and the reception area. “The scale of the changes were significant as the new arrangement has allowed employees from a different location to be moved to the Topaz building. We needed to increase the usable area by 40 pct,” says Mariusz Podbielski, the central administration manager at Allianz. All the work was completed without closing the offices. “The Allianz team is over 1,000 people who come to work on an everyday basis. We had to organise each stage of the project so as to minimise moving employees from floor to floor,” says Krzysztof Marszałek, a senior project manager at Tétris, who was in charge of the project. The schedule specified what was to happen almost every hour. “Part of the work, such as the demolition, was done at night or at the weekend, so as not to disrupt the work of the Allianz team. We often had to work an 18-hour day,” he adds. The refurbishment was completed in less than 14 months.


Newsletter
Want to know more? Sign up for the Newsletter


reklama
reklama

conferences

17th Eurobuild CEE Golf Tournament
13th Eurobuild CEE Tennis Tournament
The 3rd Architecture and Construction Festival
The 9th Conference Office Market for Poland
Eurobuild Awards 2018
reklama

reklama
About Us Contact Privacy Rules Archive Newsletter
Copyright 2017 EuroCEE. All rights reserved.