edition:
polskienglish
log in | register
previous
Larger CCC and 4F stores in Forum Gliwice
next
Working together in Finnish syle

reklama

SQ stops rising

Eurobuild CEE 12 October 2018
SQ stops rising
Work has begun on the glazed façade
POLAND Structural work on the SQ Business Center office building, which is under construction at ul. Legnicka in Wrocław, has been completed.

Currently, the building’s glass façade is being assembled, which should take until the end of November. FB Antczak, which is usually responsible for residential developments, is both the project’s developer and its general contractor. The ten-storey class A office building will comprise nearly 5,500 sqm of leasable open-plan office space. The sanitary installations and the lifts are in the core of the building, while the glazed façade is to provide ready access to sunlight office, with tilting windows and blinds that can be operated by the users of the building. The top floor is to include a private terrace of 80 sqm the top floor will also have access to a more than 80-sqm green terrace. The building will additionally have retail and service space on the ground floor and is planned to be delivered in Q1 2019.


Newsletter
Want to know more? Sign up for the Newsletter


reklama
reklama

conferences

reklama

reklama
reklama
About Us Contact Privacy Rules Archive Newsletter
Copyright 2017 EuroCEE. All rights reserved.