PL

Budimex bridges Wisłoka

Infrastructure
POLAND Budimex is completing work on its 2.5 km section of the DW936 provincial road, which will eventually make up part of the Mielec ring road (around 64 km north east of Rzeszów).

The road, which will connect, Chorzelów and Rzędzianowice is to be opened in April.

Under the design and build contract worth PLN 39 mln gross, Budimex has completed constructing the 550m bridge that spans the river Wisłoka.

“The major part of surface works on the roads and bridge was finished in 2019. Currently, we are performing the finishing work, which includes the fittings, the paving, the railings and the reinforcements. When we install the road safety equipment, such as barriers and markings, our work will be finished. Our April deadline is not at risk”, says Jarosław Jachymek, the contract director.

Latest news

Retail & leisure

Czech Republic Prague’s Černý Most shopping mall will grow

schedule 16 April 2024
Opr./edited by ANZ

Centrum Černý Most, a shopping centre in the Prague region, is set to undergo a significant expansion of 9,100 sqm that will add over 30 new shops and restaurants, as well as additional screens to the centre’s multiplex cinema.

Material partner

Poland Excellent Fern at Off Piotrkowska

schedule 04 April 2024
Eurobuild CEE

Intensive commercialization of the multifunctional Fern building under construction at Off Piotrkowska Center has begun. A modern building, the construction of which will start at the turn of 2024/2025, offers 4,700 sqm of service space and 2,700 sqm of office space.

Office & mixed-use development

Poland The Bridge has gained its height

schedule 16 April 2024
Opr./edited by ANZ

The structure of The Bridge skyscraper in Warsaw's Wola district has reached its final height, i.e. 174 m. The builders have just completed the last technical floor. Installation and finishing works inside the facility and the assembly of the facade are in progress.

Retail & leisure

Poland Glinianka changes hands

schedule 16 April 2024
Opr./edited by JC

Redkom Development sold 100 pct of shares in the company holding the Glinianka complex. The retail park, located near Warsaw, has been bought by CEE-Big Europe.

Warehouse & industrial

Poland The logistics park in Sulechów is ready

schedule 16 April 2024
Opr./edited by ANZ

Panattoni has finished the last stage of Panattoni Park Sulechów III. The centre has been developed for BestSecret, a European members-only online destination for premium and luxury off-price fashion. The building has a total area of 136,000 sqm, which makes it one of the largest logistics centres in the region.

Warehouse & industrial

Germany CTP builds for Quanta

schedule 16 April 2024
Opr./edited by JC

CTP has signed a deal with Quanta Computer, a Taiwanese company that manufactures computers and electronic hardware, for a 22,500 sqm production facility at CTPark Jülich in northwest Germany.

Warehouse & industrial

Poland Fresenius stays with Prologis

schedule 16 April 2024
Opr./edited by JC

Medical company Fresenius Medical Care has renegotiated its lease of 3,900 sqm of warehouse space and 120 sqm of office space in Prologis Park Poznań.

Events

Poland Piotr Kroenke (1950-2024)

schedule 15 April 2024
Eurobuild CEE

We regret to inform you that Piotr Kroenke, long-time general director of GTC and co-creator of many of the company's successes, has passed away.

ESG

Poland BIK Park Sosnowiec II is now BREEAM certified

schedule 15 April 2024
Opr./edited by ANZ

BIK Park Sosnowiec II has successfully passed the BREEAM certification at the Very Good level. Last year, BIK Park Wrocław I and II - two other properties from the portfolio of Biuro Inwestycji Kapitałowych - went through the same assessment process.

Investment & finance

Romania Retail is strong in Romania

schedule 15 April 2024
Opr./edited by JC

According to the special research report Romania Retail Destinations 2024, released by CBRE Romania, by the end of 2024 the stock of modern retail spaces in the country will overpass 4.5 mln sqm. It will set a new record for Romania.

Warehouse & industrial

Poland Panattoni delivers in Krakow

schedule 12 April 2024
Opr./edited by JC

Panattoni has built another facility in Lesser Poland, City Logistics Krakow Airport II. The investment was made on a speculative basis and already has its first tenant – Allegro.

Warehouse & industrial

Romania Marelvi is set to stay at MLP Bucharest West

schedule 12 April 2024
Opr./edited by ANZ

Marelvi, a distributor of electronics and home appliances in Romania, has extended its lease agreement for more than 8,100 sqm of space at the MLP Bucharest West logistics park. 

Eurobuild CEE

Poland The April edition of "Eurobuild" is now ready to read!

schedule 11 April 2024
Eurobuild CEE

The next edition of our monthly magazine is now available both in paper and digital versions! Traditionally, the new issue was first sent to our conference guests, and then to all readers!

Warehouse & industrial

Poland Midocean takes more and more

schedule 10 April 2024
Opr./edited by JC

Panattoni has launched the construction of Panattoni Park Ruda Śląska IV. A major tenant has already been found with Midocean to lease 20,000 sqm of storage space, including an extension option for a further 10,000 sqm.

Investment & finance

Poland Big splash in Silesia

schedule 10 April 2024
Opr./edited by JC

Mitiska REIM has sold a 6.7ha land plot to Momentum Leisure to develop a theme and water park which will further reinforce the offering of the Europa Centralna retail center, located in Gliwice.

ESG

Czech Republic Domeq is doing WELL

schedule 09 April 2024
Opr./edited by JC

CTP, in cooperation with Ruby Project Management, has received the highest level of the WELL certification for its project Domeq in Brno. It's the first residential investment in the country to meet the criteria.

Investment & finance

Poland Additional loan for Hillwood

schedule 08 April 2024
Opr./edited by ANZ

Hillwood has increased its loan with Millennium Bank to EUR 29 mln for the construction of phase II of the Park Hillwood Zgierz I project, located in Central Poland, 2.5 km from the A2 motorway entrance and 15.5 km from the A1 motorway junction.

Warehouse & industrial

Poland Hermes by the German border

schedule 08 April 2024
Opr./edited by JC

Panattoni has finished the construction of a logistics centre for Hermes Fulfilment. This is the first project that has been built for the company in Poland.

Office & mixed-use development

Romania Bucharest office market remains fluid and flexible

schedule 08 April 2024
Opr./edited by ANZ

Two distinct trends have emerged in 2023: securing entry into prime new locations and optimising the portfolio through best value negotiations, all driven by a market with limited deliveries. After the first three months of this year, the office sector in Bucharest shows a positive fluctuation in terms of total leasing activity, being 71 pct higher than the same period last year.

Eurobuild FM

Poland Tristram Carfrae on sustainable engineering

schedule 07 April 2024
Eurobuild CEE

Welcome to Eurobuild FM! We invited an excellent expert to the today's episode – distinguished structural engineer Tristram Carfrae, deputy chair of world-renowned design consultants Arup gave us an exclusive interview.

Latest in Infrastructure

schedule 29 November 2023

PLN 1.5 bln for the airport

The investment programme until 2030 worth more than PLN 1.5 bln has been approved for Katowice's Wojciech Korfanty Airport. The programme will include more than 20 projects, with the construction of a passenger terminal, a cargo terminal, a technical hangar, as well as taking into account changes to the airport's transport system.

schedule 13 April 2023

Powerful photovoltaic farm in Przykona

Electrum is building a 200 MW solar farm for EDP Renewables. The project will be built on 245 hectares in the Przykona municipality in the Greater Poland voivodeship. The investment is being carried out in record time of less than a year. The engineering work is scheduled to be completed in autumn 2023.

schedule 04 January 2023

Green light for Mostostal Warszawa to build S7 section

Mazowiecki province has issued a ZRID permit for Mostostal Warszawa to construct a 12 km section of the S7 expressway between Załuski and Modlin, north of Warsaw.

schedule 26 August 2022

Hupac Terminal Brwinów rolls into view

Swiss railway terminal operator Hupac has completed the development of a railway terminal in Brwinów, about 30 km west of Warsaw city centre.

schedule 19 May 2022

Plac Trzech Krzyży to be modernised

A tender has been announced to reconstruct pl. Trzech Krzyży in Warsaw.

schedule 07 April 2022

Work to start on S19 tunnel from early 2023

Mostostal Warszawa and Acciona Construcción are starting work on a 10 km section of the S19 from Rzeszów Południe to Babica.

schedule 10 March 2022

Mirbud and Kobylarnia to build S74

Development work on another section of the S74 expressway has begun with the signing of a PLN 557.7 mln contract to design and build the 16.4 km stretch of road between the Przełom/Mniów and Kielce Zachód junctions.

schedule 07 March 2022

Work soon to start on 2 km tunnel

A permit has been issued for the construction of the ZRID S19 expressway from Rzeszów to Babica.

schedule 03 March 2022

EIB finances construction of S3

The European Investment Bank has loaned Bank Gospodarstwa Krajowego EUR 250 mln for its Krajowy Fundusz Drogowy [National Road Fund] to build the S3 expressway from Świnoujście to Szczecin.

schedule 05 January 2022

Budimex delivers section of Via Baltica

A 20.17 km section of the S61 expressway has been opened between Wysokie and Raczki.

schedule 20 December 2021

Ursynów tunnel finally open

Permission has been granted to open the road tunnel that forms part of Warsaw’s southern bypass running underneath the city’s Ursynów district.

schedule 30 August 2021

Geosan completes Váhostav takeover

Czech construction group Geosan has finalised the 100 pct acquisition of Slovak construction firm Váhostav – SK.

schedule 27 August 2021

CTP to build Oradea airport terminal

Czech industrial developer CTP is to build a cargo terminal at the airport in Oradea in western Romania, after being selected to carry out the project in a tender held in August.

schedule 30 July 2021

Strabag and Hochtief win Prague metro contracts

Austrian construction firm Strabag, together with its consortium partners, has won two Prague metro contracts – the refurbishment of Jiřího z Poděbrad station and the construction of the first section of line D of the underground railway.

schedule 26 July 2021

Strabag awarded EUR 111 mln Oradea contract

Austrian construction firm Strabag has been awarded an EUR 111 mln contract to build a 19 km dual carriageway between Oradea and the A3 motorway.

schedule 22 July 2021

Warbud to build new Kostrzyn bridge

Warbud is to rebuild a road bridge over the river Warta in Kostrzyn nad Odrą, close to the Polish-German border.

schedule 20 July 2021

Skanska wins EUR 77 mln D55 contract

Skanska has been awarded a contract worth more than CZK 1.95 bln (app. EUR 77 mln) from the Czech highway authority to build a section of the D55 motorway in the area of Staré Město in Moravia.

schedule 24 June 2021

Mostostal Warszawa to renovate Wrocław depot

Mostostal Warszawa has signed a contract worth nearly PLN 30 mln with PKP Intercity to renovate the train depot at the Wrocław Główny railway station.

schedule 11 May 2021

Footbridge tender announced

The city of Warsaw has just announced a tender for a footbridge across the Vistula river.

schedule 04 May 2021

Electrifying news for Skanska

Skanska and Elzel have been awarded a contract by Správa železnic (the Czech Railway Administrator) to upgrade a 7.4 km stretch of railway in Pardubice, around 100 km east of Prague.

Edition 4 (287) April 2024

Latest comments

Categories