edition:
polskienglish
log in | register
previous
BIK happy with results
next
Aldesa in Central Park

reklama

Faster to Gdańsk

Eurobuild CEE 14 December 2017
Faster to Gdańsk

POLAND Strabag has finished the construction of an over 11-km section of S7 expressway from Rychnowo to Olsztynek, which is an extension of a previously completed Ostróda South – Rychnowo road with a length of 8.8 km.

The construction of the project started in April 2015. The contract worth a gross amount of PLN 388.5 mln was commissioned by the General Directorate of National Roads and Motorways. The section between Rychnowo and Olszytnek has two lanes with a width of 3.5 metres in each direction and an emergency parking belt. The project involved the redevelopment of sections of national road no. 7 and other categories within crossroads with the expressway. New road structures were built at the same time e.g. viaducts, access roads, bridges and passages for animals. The road has been equipped with a storm water drainage system, road lights and environmental protection devices. It is the fourth section of S7 road to be carried out by Strabag, this year the company has completed the construction of a 22-km section of Nidzica-Napierki, a 4.5-km Nowohucka route, an app. 9-km road from Ostróda to Rychnowo and the current section from Rychnowo to Olsztynek. The completed sections of S7 road offer a comfortable journey from Gdańsk to Warsaw, towards Kraków.

Newsletter
Want to know more? Sign up for the Newsletter


reklama
reklama

conferences

The 3rd Architecture and Construction Festival
The 3rd Real Estate Table Tennis Tournament
The 9th Conference Office Market for Poland
The 24th Annual Property Market Convention
Eurobuild Awards 2018
reklama

reklama
About Us Contact Privacy Rules Archive Newsletter
Copyright 2017 EuroCEE. All rights reserved.